These last ten days have been very busy. We had a channel drain installed for our brewing area and in the fermentation room. At the same time all the plumbing was done. A waterproofing team also came by to add waterproof cove for our wet areas. I installed FRP on the walls in the wet areas. I was amazed how convoluted the piping looked as it went into place but ended up making water pipe sense. Waiting for plumbing to be inspected and then our drains will all work. Awesome!
Spaghetti Pipes